Leaking Shower Repairs
April Showers    Waterproofing   Catalogue   Contact Info

        Step 5 - Partial removal of wall tiles and wall lining

        The wall tiles and wall linings have been removed. The job is
        ready to measure for the "made to measure" PVC shower tray.

  • Mark a level line around the walls at a height above 150mm (6�) from the floor and approximately 50mm (2�) below the next highest tile joint.

  • Use a small angle grinder with a 110 millimeter diamond blade. Cut through the wall
    tile and the wall lining in one action.

  • Make sure when you cut with the grinder, you wear personal protective equipment
    such as a dust mask, eye and ear protection and gloves.

  • You will need to have your made to measure PVC shower tray ordered and delivered before you can continue with the work.

Next Step

Return to LEAKING SHOWER REPAIRSReturn to CATALOGUE
April Showers    Waterproofing   Catalogue   C